Changes between Version 8 and Version 9 of docs/CommissioningPlan/P2.2


Ignore:
Timestamp:
01/26/21 16:41:00 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.2

    v8 v9  
    1 == P2.2 Instrument operability and performance ==
     1== P2.2 Instrument operability and functioning ==
    22•       **Phase**               :       2 
    33•       **Status**              :       Draft   
    44•       **Category**            :       Daytime testing (functionality and operability) (C2)                           
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       2 days
     6•       **Duration**            :       1 day
    77**Description**
    88•       The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system.
     
    1414•       Check the working of all the light sources.
    1515•       Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR.
    16 •       Finally, the performance of the system is again verified after the installation.
     16•       Finally, the performance of the system is again verified after the installation.??
    1717*      Alignment of the TECCAM (hot pixel)
    1818**Success criteria**
     
    3333MB:I believe checking functionality of motor is included in previous point . However in success criteria is correct what you wrote
    3434
    35 MB: performance checks might require more time than foreseen INCEASED TO 2 days
     35MB: performance checks might require more time than foreseenYOU ARE RIGHT. HERE WE ARE CEHCKING ONLY FUCNTIONALITY or performance???