docs/CommissioningPlan/P2.2
v8 v9 1 == P2.2 Instrument operability and performance==1 == P2.2 Instrument operability and functioning == 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 2 days6 • **Duration** : 1 day 7 7 **Description** 8 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system. … … 14 14 • Check the working of all the light sources. 15 15 • Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR. 16 • Finally, the performance of the system is again verified after the installation. 16 • Finally, the performance of the system is again verified after the installation.?? 17 17 * Alignment of the TECCAM (hot pixel) 18 18 **Success criteria** … … 33 33 MB:I believe checking functionality of motor is included in previous point . However in success criteria is correct what you wrote 34 34 35 MB: performance checks might require more time than foreseen INCEASED TO 2 days35 MB: performance checks might require more time than foreseenYOU ARE RIGHT. HERE WE ARE CEHCKING ONLY FUCNTIONALITY or performance???