    44•       **Category**            :       Daytime testing (functionality and operability) (C2)                           
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       1 day
     6•       **Duration**            :       2 days
    77**Description**
    88•       The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system.
     
    3333MB:I believe checking functionality of motor is included in previous point . However in success criteria is correct what you wrote
    3434
    35 MB: performance checks might require more time than foreseen
     35MB: performance checks might require more time than foreseen INCEASED TO 2 days