Changes between Version 7 and Version 8 of docs/CommissioningPlan/P2.2
- Timestamp:
- 01/26/21 16:38:13 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v7 v8 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 1 day6 • **Duration** : 2 days 7 7 **Description** 8 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system. … … 33 33 MB:I believe checking functionality of motor is included in previous point . However in success criteria is correct what you wrote 34 34 35 MB: performance checks might require more time than foreseen 35 MB: performance checks might require more time than foreseen INCEASED TO 2 days