  • docs/CommissioningPlan/P2.2

    v5 v6  
    66•       **Duration**            :       1 day
    77**Description**
    8 •       The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performances of the system.
     8•       The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system.
    99**Prerequisites**
    1010•       All electronics and services up and running.
     
    1515•       Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR.
    1616•       Finally, the performance of the system is again verified after the installation.
    17 *      Alignment of the TECCAM (hotpixel)
     17*      Alignment of the TECCAM (hot pixel)
    1818**Success criteria**
    1919•       Motors and light sources working as they should.
     
    2121•       Performance of the system is acceptable.
    2222**Notes**