docs/CommissioningPlan/P2.2
v5 v6 6 6 • **Duration** : 1 day 7 7 **Description** 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance sof the system.8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system. 9 9 **Prerequisites** 10 10 • All electronics and services up and running. … … 15 15 • Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR. 16 16 • Finally, the performance of the system is again verified after the installation. 17 * Alignment of the TECCAM (hot pixel)17 * Alignment of the TECCAM (hot pixel) 18 18 **Success criteria** 19 19 • Motors and light sources working as they should. … … 21 21 • Performance of the system is acceptable. 22 22 **Notes** 23 23 24 **LBTO support** 25 24 26 **Associated SHARK-NIR personnel** 25 27