docs/CommissioningPlan/P2.2
v4 v5 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 1 d yay6 • **Duration** : 1 day 7 7 **Description** 8 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performances of the system.