Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.2
- Timestamp:
- 01/18/21 14:54:03 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v3 v4 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 3 hour(s)6 • **Duration** : 1 dyay 7 7 **Description** 8 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performances of the system. … … 23 23 **LBTO support** 24 24 **Associated SHARK-NIR personnel** 25 • JF, LM, MdP, MM (from AZ) 25 26 26 27 **Date performed and by whom**