  • docs/CommissioningPlan/P2.2

    v3 v4  
    44•       **Category**            :       Daytime testing (functionality and operability) (C2)                           
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       3 hour(s)
     6•       **Duration**            :       1 dyay
    77**Description**
    88•       The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performances of the system.
     
    2323**LBTO support**
    2424**Associated SHARK-NIR personnel**
    25 •       JF, LM, MdP, MM (from AZ)
     25
     26
    2627**Date performed and by whom**