Changes between Version 30 and Version 31 of docs/CommissioningPlan/P2.2
- Timestamp:
- 09/13/22 15:47:04 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v30 v31 14 14 - SHARK-NIR is aligned and ready for the lift-off. 15 15 - People required to access the electronics platform have completed the needed training 16 - Equipment temporary connected to the rails interfering with installation removed (by LBTO personnel) 16 17 17 18 **Procedure**