Changes between Version 28 and Version 29 of docs/CommissioningPlan/P2.2


Ignore:
Timestamp:
09/07/22 20:16:22 (2 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.2

    v28 v29  
    7373- Support for the installation of electronics in the LBTO cabinet
    7474- Liquid nitrogen fill
    75 - Vacuum pump to pump down cryostat
     75- Vacuum pump to pump down cryostat (See activity P1.4 and P1.5 for more details)
    7676- Kindly check the installation document, AD3, for more details
    7777