Changes between Version 26 and Version 27 of docs/CommissioningPlan/P2.2
- Timestamp:
- 09/07/22 20:12:10 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v26 v27 35 35 - Fix cable from patch-boxes to instrument. 36 36 - **Day 5** 37 - Installation of calendered structure at its final level.37 - Move the calendered structure at its final position. 38 38 - SCICAM installation with MACIE already installed. 39 39 - Installation of electronics and cabling from patch boxes to cabinets. … … 61 61 - Activities on High-bay and telescope. 62 62 - Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from the bearing before the installation can start. Please look into the AD3 document for details. 63 - Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTI electronics cabinets (shared with LBTI and iLocater). 64 - Input from Laura Funk (LBTO): Installation of the LBT work platform takes around 2 hours and, of course, also its removal. If the telescope installation is performed during the observing semester, carefully plan activities that can be completed so as not to interfere with handover for nighttime observations (~2 hours before sunset). 63 - Note that othe Lakeshore of the SHARK-NIR electronics is installed within the LBTI electronics cabinets, the rest of the electronics is in the cabinet shared with iLocater. 65 64 - check this link (https://docs.google.com/document/d/1r0SDiy9yBEfGQjDI6hCXT9hfRDRJ4dh4nNUZ3JHClJE/edit) for some details on the alignment day to day plan. 66 65