Changes between Version 13 and Version 14 of docs/CommissioningPlan/P2.2
- Timestamp:
- 02/04/21 21:27:01 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v13 v14 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C 2)4 • **Category** : Daytime testing (functionality and operability) (C3) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 6 • **Duration** : 2 day … … 29 29 30 30 **Comments** 31 32 MB:I believe checking functionality of motor is included in previous point . However in success criteria is correct what you wrote