Changes between Version 12 and Version 13 of docs/CommissioningPlan/P2.2
- Timestamp:
- 02/03/21 12:55:18 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.2
v12 v13 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 1day6 • **Duration** : 2 day 7 7 **Description** 8 8 • The functionality and operability of individual components/subsystems are tested. This is followed by the checking of the internal alignment of the instrument using the light source within. The final step is the performance of the system.