Changes between Version 9 and Version 10 of docs/CommissioningPlan/P2.2


Ignore:
Timestamp:
01/31/21 11:03:50 (4 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.2

    v9 v10  
    3434
    3535MB: performance checks might require more time than foreseenYOU ARE RIGHT. HERE WE ARE CEHCKING ONLY FUCNTIONALITY or performance???
     36
     37LM: I would see in this phase just a check of the internal alignment by checking at the position of the PSF both on the SCICAM and on the TECCAM, and at the position of the pupil on the SCICAM. Finally, another check of on-axis optical quality using phase diversity. I do not understand what "Alignment of TECCAM" means..