Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.1


Ignore:
Timestamp:
01/22/21 10:23:07 (4 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.1

    v6 v7  
    3030
    3131**Date performed and by whom**
     32
     33**Comments**
     34
     35MB: cabling between cabinet and SHARK-NIR patch boxes for motors and panel for other needs to take place either on the instalaltion, here or adding a point in between.
     36
     37MB: No button is foreseen. However shutdown procedure should be checked
     38
     39MB: Knob controlling is LBTI side not LBTO