Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.1
- Timestamp:
- 01/22/21 10:23:07 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.1
v6 v7 30 30 31 31 **Date performed and by whom** 32 33 **Comments** 34 35 MB: cabling between cabinet and SHARK-NIR patch boxes for motors and panel for other needs to take place either on the instalaltion, here or adding a point in between. 36 37 MB: No button is foreseen. However shutdown procedure should be checked 38 39 MB: Knob controlling is LBTI side not LBTO