Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.1
- Timestamp:
- 01/18/21 14:52:17 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.1
v3 v4 1 == P2.1 Activating the instrument and testing instrument states & transitions==1 == P2.1 Activating the instrument, basic check, initiate cryostat cool down == 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 1 hour(s)6 • **Duration** : 1 day 7 7 **Description** 8 8 • Activating the instrument after the installation of SHARK-NIR at the telescope platform. Also, various instrument states will be tested including the emergency shutdown switch. … … 26 26 • Testing the electronics and SW working of the knob (motor) controlling the cool down. 27 27 **Associated SHARK-NIR personnel** 28 • JF, LM, MdP, MM (from AZ) 28 29 29 **Date performed and by whom**