Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.1
- Timestamp:
- 01/11/21 14:56:43 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.1
v2 v3 14 14 • Start the cryostat is cool down. 15 15 • Test the emergency shutdown button. 16 • Testing the electronics and SW rotation of the knob controlling the cool down process (LBTO side. Maria knows more details) 17 • Cool down the cryostat 16 18 **Success criteria** 17 19 • Activating instrument successfully. … … 22 24 **LBTO support** 23 25 • Communicate while checking the emergency shutdown button. 26 • Testing the electronics and SW working of the knob (motor) controlling the cool down. 24 27 **Associated SHARK-NIR personnel** 25 28 • JF, LM, MdP, MM (from AZ)