    v2 v3  
    1414•       Start the cryostat is cool down.
    1515•       Test the emergency shutdown button.
     16•       Testing the electronics and SW rotation of the knob controlling the cool down process (LBTO side. Maria knows more details)
     17•       Cool down the cryostat
    1618**Success criteria**
    1719•       Activating instrument successfully.
     
    2224**LBTO support**
    2325•       Communicate while checking the emergency shutdown button.
     26•       Testing the electronics and SW working of the knob (motor) controlling the cool down.
    2427**Associated SHARK-NIR personnel**
    2528•       JF, LM, MdP, MM (from AZ)