    1616- Switch on all the cabinets, follow the instrument telemetry and see if the telemetry is logging.
    1717- Turn all the hardware subsystems turned on and start all the corresponding services. Check all the logs from the services.
    18 - Check the shutdown procedure (except the cryostat warm-up).
     18- Check the shutdown procedure.
    1919- Testing the electronics and SW rotation of the knob controlling the cool down process (LBTI side).
    20 - Cooldown the cryostat.
     20- Cool down the cryostat.
    2121
    2222**Templates**
     
    3232**LBTO support**
    3333- Testing the working of the knob (motor or manual) controlling the cooldown.
    34 - Liquid Nitrogen fill
    35 - Vacuum pump
     34- Liquid Nitrogen fill.
     35- Vacuum pump (See activity P1.4 and P1.5 for more details).