Version 4 (modified by kradhakrishnan, 2 years ago) (diff) |
---|
P2.10 Test of all the remaining templates for sky observations
- Phase : 2
- Status : Draft
- Category : Daytime testing (functionality and operability) (C3)
- Recurrence : once after instrument installation at telescope platform
- Duration : 2 days (TBC)
Description
- To verify all the (possible) remaining templates for sky observations, including testing the observing block template for a few specific configurations.
Prerequisites
- Authorize SHARK-NIR on the SX side.
Procedure
- TBW
Templates
Success criteria
- TBW
Notes
LBTO support
- AO support
Date performed and by whom