Changes between Version 5 and Version 6 of docs/CommissioningPlan/P2.10
- Timestamp:
- 10/28/22 19:07:56 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.10
v5 v6 1 == P2.10 Test of all the remainingtemplates for sky observations ==1 == P2.10 Test of the templates for sky observations == 2 2 3 3 - **Phase** : 2 … … 8 8 9 9 **Description** 10 - To verify all the (possible) remaining templates for sky observations, including testing the observing block template for a few specific configurations.10 - To verify all the (possible) templates for sky observations, including testing the observing block template for a few specific configurations. This can test the bare flow, in the sense that we are obtaining not meaningful images, but we can test that they technically work as expected. 11 11 12 12 **Prerequisites** … … 14 14 15 15 **Procedure** 16 - Telescope static at Zenith 16 - Telescope static and pointed to the zenith for almost all the tests. 17 - Only exception to zenith will be if the SHARK-NIR team could send preset to the telescope and move the telescope. 18 17 19 18 20 **Templates** 21 - SHARKNIR_cal_Astrometry 22 - SHARKNIR_gen_mon_DistortionMap 23 24 - SHARKNIR_cal_Flux 25 - SHARKNIR_lss_cal_AbsoluteFlux 26 - SHARKNIR_lss_cal_RemoveTelluric 27 28 - SHARKNIR_gen_cal_TelescopeFlatField 29 - SHARKNIR_cal_SkyBackground 30 31 - SHARKNIR_ci_obs 32 - SHARKNIR_di_obs 33 - SHARKNIR_lss_obs 34 35 - SHARKNIR_ci_acq 36 - SHARKNIR_di_acq 37 - SHARKNIR_lss_acq 38 39 - SHARKNIR_gen_tec_ActiveOptics 40 - SHARKNIR_gen_tec_PointingCorrection 19 41 20 42 **Success criteria** 21 - TBW43 - All the templates successfully completed. 22 44 23 45 **Notes** … … 26 48 **LBTO support** 27 49 - AO support 50 - If the SHARK-NIR team could can move the Telescope for these templates - SHARKNIR_ci_acq, SHARKNIR_di_acq, and SHARKNIR_lss_acq, some LBT support would be appreciated. 28 51 29 52 **Date performed and by whom**