Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.10


Ignore:
Timestamp:
09/21/22 12:41:55 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.10

    v3 v4  
     1 == P2.10 Test of all the remaining templates for sky observations ==
     2 
     3- **Phase**             :       2 
     4- **Status**            :       Draft   
     5- **Category**  :       Daytime testing (functionality and operability) (C3)
     6- **Recurrence**        :       once after instrument installation at telescope platform
     7- **Duration**  :       2 days (TBC)
     8
     9**Description**
     10- To verify all the (possible) remaining templates for sky observations, including testing the observing block template for a few specific configurations.
     11
     12**Prerequisites**
     13- Authorize SHARK-NIR on the SX side.
     14
     15**Procedure**
     16- TBW
     17
     18**Templates**
     19
     20**Success criteria**
     21- TBW
     22
     23**Notes**
     24
     25
     26**LBTO support**
     27- AO support
     28
     29**Date performed and by whom**