Changes between Version 1 and Version 2 of docs/CommissioningPlan/P2.10
- Timestamp:
- 01/14/22 18:01:33 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.10
v1 v2 1 1 2 == P2.10 Cryostat warm up check == 2 • **Phase** : 1 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 • **Recurrence** : at the end of every SHARK-NIR run? 6 • **Duration** : 2 days 3 4 - **Phase** : 1 5 - **Status** : Draft 6 - **Category** : Daytime testing (functionality and operability) (C3) 7 - **Recurrence** : at the end of every SHARK-NIR run? 8 - **Duration** : 2 days 9 7 10 **Description** 8 • Checking the cryostat warming up procedure. 11 - Checking the cryostat warming up procedure. 12 9 13 **Prerequisites** 10 • SHARK-NIR connected to LBT network. 11 • Automatic logging of the cryostat temperature 14 - SHARK-NIR connected to LBT network. 15 - Automatic logging of the cryostat temperature. 16 12 17 **Procedure** 13 • Run the cryostat warm up sequence 14 • Check how the system is performing every 30 minutes 18 - Run the cryostat warm-up sequence. 19 - Check how the system is performing every 30 minutes. 20 21 **Templates** 22 15 23 **Success criteria** 16 • Cryostat warmed up without any issues. 17 • The temperature at the detector is stable at ?? 24 - Cryostat warmed up without any issues. 25 - The temperature at the detector is stable at dome temperature. 26 18 27 **Notes** 19 28 20 29 **LBTO support** 21 30 22 **Associated SHARK-NIR personnel**23 24 31 **Date performed and by whom**