    12== P2.10        Cryostat warm up check  ==
    2 •       **Phase**               :       1 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Daytime testing (functionality and operability) (C2)
    5 •       **Recurrence**  :       at the end of every SHARK-NIR run?
    6 •       **Duration**            :       2 days
     3
     4- **Phase**             :       1 
     5- **Status**            :       Draft   
     6- **Category**  :       Daytime testing (functionality and operability) (C3)
     7- **Recurrence**        :       at the end of every SHARK-NIR run?
     8- **Duration**  :       2 days
     9
    710**Description**
    8 •       Checking the cryostat warming up procedure.
     11- Checking the cryostat warming up procedure.
     12
    913**Prerequisites**
    10 •       SHARK-NIR connected to LBT network.
    11 •       Automatic logging of the cryostat temperature
     14- SHARK-NIR connected to LBT network.
     15- Automatic logging of the cryostat temperature.
     16
    1217**Procedure**
    13 •       Run the cryostat warm up sequence
    14 •       Check how the system is performing every 30 minutes
     18- Run the cryostat warm-up sequence.
     19- Check how the system is performing every 30 minutes.
     20
     21**Templates**
     22
    1523**Success criteria**
    16 •       Cryostat warmed up without any issues.
    17 •       The temperature at the detector is stable at ??
     24- Cryostat warmed up without any issues.
     25- The temperature at the detector is stable at dome temperature.
     26
    1827**Notes**
    1928
    2029**LBTO support**
    2130
    22 **Associated SHARK-NIR personnel**
    23 
    2431**Date performed and by whom**