  • docs/CommissioningPlan/P2.0B

    v5 v6  
    2626**Notes**
    2727- Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater).
     28- Input from Laura Funk (LBTO): Installation of the LBT platform takes around 4 hours and of course also its removal.
    2829
    2930**LBTO support**