Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.0A
- Timestamp:
- 02/01/22 11:22:58 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0A
v6 v7 19 19 20 20 **Success criteria** 21 - SHARK-NIR is successfully installed atthe LBT platform.21 - SHARK-NIR is successfully installed on the LBT platform. 22 22 - Telescope is balanced. 23 23 - Connect all the cables and secure them. … … 26 26 **Notes** 27 27 - Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from the bearing before the installation can start. Please look into the AD3 document for details. 28 - Input from Laura Funk (LBTO): Installation of the LBT platform takes around 4 hours and of course also its removal.28 - Input from Laura Funk (LBTO): Installation of the LBT work platform takes around 2 hours and of course also its removal. If the telescope installation is performed during the observing semester, carefully plan activities that can be completed so as not to interfere with handover for nighttime observations (~2 hours before sunset). 29 29 30 30 **LBTO support**