docs/CommissioningPlan/P2.0A
v5 v6 26 26 **Notes** 27 27 - Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from the bearing before the installation can start. Please look into the AD3 document for details. 28 - Input from Laura Funk (LBTO): Installation of the LBT platform takes around 4 hours and of course also its removal. 28 29 29 30 **LBTO support**