Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.0A
- Timestamp:
- 02/03/21 18:52:14 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0A
v2 v3 4 4 • **Category** : Installation of SHARK-NIR at LBT platform (C2) 5 5 • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) 6 • **Duration** : 2 days for preparation, 1 day for installation, and 1 day contingency.6 • **Duration** : 2 days for preparation, 2 days for installation, and 1 day contingency. 7 7 **Description** 8 8 • Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform. … … 23 23 * Crane operator (mountain bay, LBT platform) 24 24 * Safety officer 25 * Working platform installed in front of the Gregorian focal-station SX ,25 * Working platform installed in front of the Gregorian focal-station SX 26 26 * Hatch door SX on the UIAP platform removed 27 * Support for the installation of electronics in LBTI/SHARKcabinet28 * kindly check the installation documentfor more details27 * Support for the installation of electronics in the LBTO cabinet 28 * Kindly check the installation document, AD3, for more details 29 29 30 30 **Associated SHARK-NIR personnel**