Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.0A


Ignore:
Timestamp:
02/03/21 18:52:14 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.0A

    v2 v3  
    44•       **Category**            :       Installation of SHARK-NIR at LBT platform (C2) 
    55•       **Recurrence**  :       once (unless deemed necessary to remove SHARK-NIR from the telescope platform)
    6 •       **Duration**            :       2 days for preparation, 1 day for installation , and 1 day contingency.
     6•       **Duration**            :       2 days for preparation, 2 days for installation, and 1 day contingency.
    77**Description**
    88•       Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform.
     
    2323* Crane operator (mountain bay, LBT platform)
    2424* Safety officer
    25 * Working platform installed in front of the Gregorian focal-station SX,
     25* Working platform installed in front of the Gregorian focal-station SX
    2626* Hatch door SX on the UIAP platform removed
    27 * Support for the installation of electronics in LBTI/SHARK cabinet
    28 * kindly check the installation document for more details
     27* Support for the installation of electronics in the LBTO cabinet
     28* Kindly check the installation document, AD3, for more details
    2929
    3030**Associated SHARK-NIR personnel**