Changes between Version 9 and Version 10 of docs/CommissioningPlan/P1.9
- Timestamp:
- 02/03/21 17:44:42 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.9
v9 v10 1 == P1.9 Science detector calibrations==2 • **Phase** : 11 == P1.9 Check the working of the internal tip-tilt loop == 2 • **Phase** : 2 3 3 • **Status** : Draft 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 • **Recurrence** : once 4 • **Category** : Unpack, Assemble, and Verification (C1)??? 5 • **Recurrence** : once at commissioning 6 6 • **Duration** : 1 day 7 7 **Description** 8 • Calibration and testing of the SHARK-NIR science detector 8 • Check the working of the internal tip-tilt loop using calibration unit light sources, C-RED2, and ALPAO-DM. 9 9 10 **Prerequisites** 10 • SHARK-NIR connected to LBT network. 11 • Electronics cabinets on. 12 • The cryostat should be running and cooled down. 13 • Internal alignment of the SHARK-NIR is verified. 11 • SCICAM cooled down. 12 14 13 **Procedure** 15 • check bias calibration & master dark scripts and then perform the following daytime calibration procedures below. 16 17 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]|| 18 ||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]|| 19 ||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]|| 20 ||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]|| 21 ||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]|| 22 ||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]|| 23 ||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]|| 24 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]|| 25 26 * Check the working of all the detector read-out modes and windowing possibilities. 14 • Run the internal tip-tilt loop routine for different brightness of the source (star). 15 * Check its efficiency in keeping the PSF at the C-RED2 hot-pixel. 16 * Save data to repository and analyze them. 27 17 28 18 **Success criteria** 29 • linearity as expected 30 • bad pixels mask created 31 • bias and flat took 32 * All individual activity (in the table) success criteria is met 19 * Internal tip-tilt routine works fine and the PSF ar C-RED2 is stable within the required precision. 20 • All the data and analysis saved in the repository. 33 21 **Notes** 34 • Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline. 22 35 23 **LBTO support** 36 24 … … 40 28 41 29 **Comments** 42 * MB: not sure about all these. It should already take place in Padova. For sure bias offset will be recomputed at these elevation due to different temperature than can be reached