Changes between Version 7 and Version 8 of docs/CommissioningPlan/P1.8


Ignore:
Timestamp:
01/31/21 10:43:24 (4 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.8

    v7 v8  
    1212•       The cryostat should be running and cooled down.
    1313**Procedure**
    14 •       Use the on-axis calibration fiber and checking if the PSF position on the scientific detector is consistent with the one recorded before shipping for multiple bearing angles. Perform Phase DIversity measurement to compare the retrieved aberrations on the on-axis PSF with the ones measured before shipping.
     14•       Use the on-axis calibration fiber and checking if the PSF position on the scientific detector is consistent with the one recorded before shipping for multiple bearing angles. Perform Phase Diversity measurement to compare the retrieved aberrations on the on-axis PSF with the ones measured before shipping.
    1515•       Check the pupil position at the detector and verify the consistency with the one before shipping.
    1616•       Check the relative alignment of the coronographic masks.