Changes between Version 6 and Version 7 of docs/CommissioningPlan/P1.7


Ignore:
Timestamp:
02/02/21 14:26:56 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.7

    v6 v7  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
     4•       **Category**            :       Unpack, Assemble, and Verification (C1)
    55•       **Recurrence**  :       once
    66•       **Duration**            :       half a day
     
    3131
    3232**Comments**
    33 Mmmmm, not super sure what this test means. The operability of the motors has already been tested when you initialized them the first time (in the sense, you know they are moving). If with "reaching the nominal position" you mean that they reach the foreseen number of steps for each saved position, I agree this can be done now, while if optical feedback is required, this is better to be done after the internal alignment of the instrument has been checked.
     33* LM: Mmmmm, not super sure what this test means. The operability of the motors has already been tested when you initialized them the first time (in the sense, you know they are moving). If with "reaching the nominal position" you mean that they reach the foreseen number of steps for each saved position, I agree this can be done now, while if optical feedback is required, this is better to be done after the internal alignment of the instrument has been checked.