Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.7
- Timestamp:
- 01/27/21 19:07:26 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.7
v5 v6 10 10 • SHARK-NIR connected to LBT network. 11 11 • Electronics cabinets on. 12 • DM best shape uploaded (shape minimizing internal aberrations) 12 13 • The cryostat should be running and cooled down. 13 14 **Procedure** … … 30 31 31 32 **Comments** 32 33 Mmmmm, not super sure what this test means. The operability of the motors has already been tested when you initialized them the first time (in the sense, you know they are moving). If with "reaching the nominal position" you mean that they reach the foreseen number of steps for each saved position, I agree this can be done now, while if optical feedback is required, this is better to be done after the internal alignment of the instrument has been checked.