Changes between Version 16 and Version 17 of docs/CommissioningPlan/P1.7


Ignore:
Timestamp:
04/22/22 17:31:53 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.7

    v16 v17  
    1 == P1.7 Motor/light sources functional verification and filter artifacts/defects verification ==
     1
     2== P1.7 Science detector calibrations ==
    23
    34- **Phase**             :       1 
    45- **Status**            :       Draft   
    5 - **Category**  :       Unpack, Assemble, and Verification (C1)
    6 - **Recurrence**        :       once
    7 - **Duration**  :       1.5 days
     6- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
     7- **Recurrence**        :       starting from commissioining. daily/weekly/monthly/yearly depending on individual activities.
     8- **Duration**  :       0.5 day
    89
    910**Description**
    10 - Checking the working of motors and light sources within SHARK-NIR using optical feedback. Finding the filter defects/artefacts using an internal calibration source (flat-field) within the instrument.
     11- Calibration and testing of the SHARK-NIR science detector.
    1112
    1213**Prerequisites**
    1314- SHARK-NIR connected to LBT network.
    14 - Electronics racks on.
    15 - DM best shape uploaded (shape minimizing internal aberrations)
     15- Electronics cabinets on.
    1616- The cryostat should be running and cooled down.
     17- Internal alignment of the SHARK-NIR is verified.
    1718
    1819**Procedure**
    19 - When the services are up and running, after the motors are sent to home positions, each of the individual motors is individually tested for their different named/nominal positions.
    20 - The light sources within SHARK-NIR are used simultaneously to check the working of the motors looking at the optical feedback.
    21 - Check the CRED-2 and ALPAO-DM SW using optical feedback.
    22 - Take the images of all the filters using the internal calibration source (flat-field) within the instrument to locate/find out the filter defects/artefacts, if any. You may take short- and long-exposures to get better contrast of the features if required.
    23 - Check the filter wheel position monitoring script detailed in [wiki:/docs/Commissioning/SNM1 SNM1]. Save the data in the repository.
     20- Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
     21
     22||**Code**||**Activity**||**Location to perform this test**||
     23||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||Padova / LBT cleanroom / LBT Platform||
     24||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||Padova / LBT cleanroom||
     25||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||Padova / LBT cleanroom||
     26||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||Padova / LBT cleanroom / LBT Platform||
     27||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||Padova / LBT cleanroom / LBT Platform||
     28||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||Padova / LBT cleanroom / LBT Platform||
     29||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||Padova / LBT cleanroom||
     30||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova||
     31
     32- Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory.
    2433
    2534**Templates**
    26 - SHARKNIR_ci_mon_LyotMaskPos (not released)
    27 - SHARKNIR_di_mon_MaskRepeatability (not released)
     35- SHARKNIR_cal_InstrumentBackground (not released)
     36- SHARKNIR_gen_cal_InstrumentFlatField (not released)
     37- SHARKNIR_lss_cal_Wavelenght (not released)
     38- SHARKNIR_gen_mon_ThermalBackground (not released)
     39- SHARKNIR_di_mon_DetectorGain (not released)
     40- SHARKNIR_ci_mon_DetectorPersistence (not released)
     41- SHARKNIR_lss_mon_SpectraResolution (not released)
     42- SHARKNIR_cal_mon_Ghost (not released)
    2843
    2944**Success criteria**
    30 - All the motors can reach the named positions / nominal positions.
    31 - All the light sources are working and confirmed through optical feedback at the SCICAM.
    32 - Filter wheel position monitoring script is run successfully and data is saved in the repository.
    33 - CRED-2 AND ALPAO-DM working normally.
    34 - All the filter images are saved.
     45- SCICAM linearity as expected.
     46- SCICAM bad pixels mask created.
     47- SCICAM  bias and flat scripts working.
     48- All individual activity (in the table) success criteria are met.
    3549
    3650**Notes**
     51- Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline.
    3752
    3853**LBTO support**