Version 6 (modified by mbergomi, 4 years ago) (diff) |
---|
P1.6 Cool down the cryostat
- Phase : 1
- Status : Draft
- Category : Unpack, Assemble, Verification, and Installation (C1)
- Recurrence : once
- Duration : 1 day
Description
- Cooldown the cryostat.
Prerequisites
- SHARK-NIR connected to LBT network.
- Electronics cabinets on.
- Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good, but the required amount is 10e-3 only.)
- Liquid nitrogen pumped?
Procedure
- Run the cryostat cooling down sequence
- Check how the system is performing every 30 minutes
Success criteria
- Cryostat cooled down without any issues.
- The temperature at the detector is stable at 77K
Notes
LBTO support
- Liquid Nitrogen refill. Note that we do not mention Liquid Nitrogen refills in any other place. This has to be done periodically every 24 hours.
Associated SHARK-NIR personnel
Date performed and by whom
Comments
MB:not sure of the meaning of sentence in LBTO support MB: i have a few comments, easier to discuss by chat/video