    1010•       SHARK-NIR connected to LBT network.
    1111•       Electronics cabinets on.
    12 •       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good (see the cryostat manual SHARK-NIR_SO-MAN-001).
     12•       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 Torr is good (see the cryostat manual SHARK-NIR_SO-MAN-001).
    1313•       Liquid nitrogen pumped?
    1414**Procedure**