docs/CommissioningPlan/P1.6
v7 v8 10 10 • SHARK-NIR connected to LBT network. 11 11 • Electronics cabinets on. 12 • Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good , but the required amount is 10e-3 only.)12 • Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good (see the cryostat manual SHARK-NIR_SO-MAN-001). 13 13 • Liquid nitrogen pumped? 14 14 **Procedure** 15 • Run the cryostat cooling down sequence15 • Start the cryostat cooling down sequence (see the cryostat manual SHARK-NIR_SO-MAN-001). 16 16 • Check how the system is performing every 30 minutes 17 17 **Success criteria** … … 21 21 22 22 **LBTO support** 23 • Liquid Nitrogen refill is required at the cleanroom. 23 • Liquid Nitrogen refill is required in the cleanroom. 24 * Vacuum pump and support for cooling down the cryostat. 24 25 **Associated SHARK-NIR personnel** 25 26 … … 27 28 28 29 **Comments** 29 30 MB:not sure of the meaning of sentence in LBTO support31 32 MB: i have a few comments, easier to discuss by chat/video