  • docs/CommissioningPlan/P1.6

    v7 v8  
    1010•       SHARK-NIR connected to LBT network.
    1111•       Electronics cabinets on.
    12 •       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good, but the required amount is 10e-3 only.)
     12•       Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good (see the cryostat manual SHARK-NIR_SO-MAN-001).
    1313•       Liquid nitrogen pumped?
    1414**Procedure**
    15 •       Run the cryostat cooling down sequence
     15•       Start the cryostat cooling down sequence (see the cryostat manual SHARK-NIR_SO-MAN-001).
    1616•       Check how the system is performing every 30 minutes
    1717**Success criteria**
     
    2121
    2222**LBTO support**
    23 •       Liquid Nitrogen refill is required at the cleanroom.
     23•       Liquid Nitrogen refill is required in the cleanroom.
     24* Vacuum pump and support for cooling down the cryostat.
    2425**Associated SHARK-NIR personnel**
    2526
     
    2728
    2829**Comments**
    29 
    30 MB:not sure of the meaning of sentence in LBTO support
    31 
    32 MB: i have a few comments, easier to discuss by chat/video