Changes between Version 3 and Version 4 of docs/CommissioningPlan/P1.6


Ignore:
Timestamp:
01/21/21 10:45:40 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.6

    v3 v4  
    1919•       The temperature at the detector is stable at 77K
    2020**Notes**
     21
    2122**LBTO support**
    22 •       Liquid Nitrogen refill. Note that we do not mention about Liquid Nitrogen refill in any other place. This has to be done periodically every 24 hours.
     23•       Liquid Nitrogen refill. Note that we do not mention Liquid Nitrogen refill in any other place. This has to be done periodically every 24 hours.
    2324**Associated SHARK-NIR personnel**
    2425