  • docs/CommissioningPlan/P1.6

    v2 v3  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)                           
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       8 hour(s)
     6•       **Duration**            :       1 day
    77**Description**
    88•       Cooldown the cryostat.
     
    1717**Success criteria**
    1818•       Cryostat cooled down without any issues.
    19 •       The temperature at the detector is stable at 77K ?
     19•       The temperature at the detector is stable at 77K
    2020**Notes**
    2121**LBTO support**
    2222•       Liquid Nitrogen refill. Note that we do not mention about Liquid Nitrogen refill in any other place. This has to be done periodically every 24 hours.
    2323**Associated SHARK-NIR personnel**
    24 •       JF, LM, MdP, MM(from AZ)
     24
    2525**Date performed and by whom**