Changes between Version 25 and Version 26 of docs/CommissioningPlan/P1.6


Ignore:
Timestamp:
02/24/22 15:04:45 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.6

    v25 v26  
    3131
    3232**LBTO support**
    33 - Liquid Nitrogen refill is required in the cleanroom. For the first fill, 40L of LN2 is required. For refill, every 48 hours, 15-18L of LN2 is required (see Notes section for more details).
    34 - Vacuum pump and support for cooling down the cryostat. We do not yet have the dimensions of the vacuum pump (available from LBTO) and how the LN2 refill will take place. If they will be done using long hoses then both vacuum pump and LN2 tank can stay outside the clean tent.
    35 - See the Notes section above for more details about the vacuum pump and the amount of LN2 required (for first fill and every other refills).
     33- Liquid Nitrogen refill is required in the cleanroom. For the first fill, 40L of LN2 is required. For refill, every 48 hours, 15-18L of LN2 is required (see Notes section above for more details).
     34- Vacuum pump and support for cooling down the cryostat. We do not yet have the dimensions of the vacuum pump (available from LBTO) and how the LN2 refill will take place. If they will be done using long hoses then both vacuum pump and LN2 tank can stay outside the clean tent (see Notes section above for more details).
    3635
    3736**Date performed and by whom**