Changes between Version 14 and Version 15 of docs/CommissioningPlan/P1.6
- Timestamp:
- 02/03/21 11:48:30 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.6
v14 v15 13 13 **Procedure** 14 14 • Start the cryostat cooling down sequence (see the cryostat manual SHARK-NIR_SO-MAN-001). 15 • Check how the system is performing every 30 minutes 15 • Check how the system is performing every 30 minutes. 16 16 **Success criteria** 17 17 • Cryostat cooled down without any issues. 18 • The temperature at the detector is stable at 77K 18 • The temperature at the detector is stable at 77K. 19 19 **Notes** 20 20 * This activity can run in parallel with other cleanroom activities (which do not need a cold detector). … … 28 28 29 29 **Comments** 30 * LM: I do not see liquid nitrogen pumped as a prerequisite, but rather part of the procedure [DONE]