Version 13 (modified by lmarafatto, 4 years ago) (diff) |
---|
P1.5 Start all the services and initialize all the motors
- Phase : 1
- Status : Draft
- Category : Unpack, Assemble, Verification, and Installation (C1)
- Recurrence : once
- Duration : half a day
Description
- When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.
Prerequisites
- SHARK-NIR connected to the LBT network (P1.4 should be completed).
- Electronics cabinets on.
- A script to initialize the motors.
Procedure
- Switch on the electronics cabinets and individual components.
- Start individual services.
- Initialize all motors together (using the buttons in the final SW GUI).
- Check also the button which puts every moving component in their resting positions.
- Check in the final version of the SW GUI if the individual initialization buttons work.
- Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs.
- Check the electronics/SW of the CRED-2 and ALPAO-DM. Make sure that they both can be individually switched on and off remotely.
Success criteria
- All the services are up and running with no fatal errors and understand the errors or warnings if any.
- All the motors are working, initialized, and sent to the nominal positions.
- CRED-2 and ALPAO-DM electronics and SW working as expected.
Notes
LBTO support
Associated SHARK-NIR personnel
Date performed and by whom
Comments LM: add in the procedure also starting of SCICAM electronics and try to acquire and store an image (in warm conditions of course)