Changes between Version 1 and Version 2 of docs/CommissioningPlan/P1.5
- Timestamp:
- 10/06/20 12:02:44 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.5
v1 v2 8 8 • When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions. 9 9 **Prerequisites** 10 • SHARK-NIR connected to LBT network.10 • SHARK-NIR connected to the LBT network (P1.4 should be completed). 11 11 • Electronics cabinets on. 12 12 • A script to initialize the motors.