wiki:docs/CommissioningPlan/P1.5

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P1.5 Start all the services and initialize all the motors

  • Phase : 1
  • Status : Draft
  • Category : Installation, integration, verification (C1)
  • Recurrence : once
  • Duration : 20 minutes

Description

  • When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.

Prerequisites

  • SHARK-NIR connected to LBT network.
  • Electronics cabinets on.
  • A script to initialize the motors.

Procedure

  • Switch on the electronics cabinets and individual components.
  • Start individual services.
  • Initialize every motor (possibly by running a script).

Success criteria

  • All the services are up and running with no fatal errors and understand the errors or warnings if any.
  • All the motors are working, initialized, and sent to the nominal positions.

Notes LBTO support Associated SHARK-NIR personnel

  • JF, LM, MdP,

Date performed and by whom