Version 1 (modified by kradhakrishnan, 5 years ago) (diff) |
---|
P1.5 Start all the services and initialize all the motors
- Phase : 1
- Status : Draft
- Category : Installation, integration, verification (C1)
- Recurrence : once
- Duration : 20 minutes
Description
- When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.
Prerequisites
- SHARK-NIR connected to LBT network.
- Electronics cabinets on.
- A script to initialize the motors.
Procedure
- Switch on the electronics cabinets and individual components.
- Start individual services.
- Initialize every motor (possibly by running a script).
Success criteria
- All the services are up and running with no fatal errors and understand the errors or warnings if any.
- All the motors are working, initialized, and sent to the nominal positions.
Notes LBTO support Associated SHARK-NIR personnel
- JF, LM, MdP,
Date performed and by whom