Changes between Version 13 and Version 14 of docs/CommissioningPlan/P1.5
- Timestamp:
- 01/28/21 15:45:56 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.5
v13 v14 19 19 * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. 20 20 * Check the electronics/SW of the CRED-2 and ALPAO-DM. Make sure that they both can be individually switched on and off remotely. 21 * Start the SCICAM electronics and acquire (and store) an image in warm conditions. 21 22 22 23 **Success criteria** … … 34 35 35 36 **Comments** 36 LM: add in the procedure also starting of SCICAM electronics and try to acquire and store an image (in warm conditions of course) 37 LM: add in the procedure also starting of SCICAM electronics and try to acquire and store an image (in warm conditions of course) [DONE]