Changes between Version 11 and Version 12 of docs/CommissioningPlan/P1.5
- Timestamp:
- 01/25/21 13:41:00 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.5
v11 v12 18 18 * Check in the final version of the SW GUI if the individual initialization buttons work. 19 19 * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. 20 * Check the electronics/SW of the CRED-2 and ALPAO-DM. Make sure that they both can be individually switched on and off remotely. 20 21 21 22 **Success criteria** 22 23 • All the services are up and running with no fatal errors and understand the errors or warnings if any. 23 24 • All the motors are working, initialized, and sent to the nominal positions. 25 * CRED-2 and ALPAO-DM electronics and SW working as expected. 24 26 **Notes** 25 27