    66•       **Duration**            :       half a day
    77**Description**
    8 •       At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to LBT network.
     8•       At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations and connect SHARK-NIR to the LBT network.
    99**Prerequisites**
    10 •       All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network.
     10•       All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network.
    1111**Procedure**
    1212•       Carefully cable in SHARK-NIR.
     
    1717**Success criteria**
    1818•       Electronics cabinets are powered on (working of led lights, fans, etc.).
    19 •       SHARK-NIR can be accessed through LBT network (e.g. Switching on/off services remotely from the control room).
     19•       SHARK-NIR can be accessed through the LBT network (e.g. Switching on/off services remotely from the control room).
    2020**Notes**
     21
    2122**LBTO support**
    2223•       IT Support to connect to the LBT network.