    1 == P1.4 Cable in the instrument, power on, and connect to LBT network ==
     1== P1.4 Cable in the instrument, power on, install workstations, and connect to LBT network ==
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
     
    66•       **Duration**            :       2 hour(s)
    77**Description**
    8 •       At the LBT clean room, cable in the instrument. Power on the cabinets, and connect SHARK-NIR to LBT network.
     8•       At the LBT clean room, cable in the instrument. Power on the cabinets,install workstations, and connect SHARK-NIR to LBT network.
    99**Prerequisites**
    1010•       All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network.
     
    1212•       Carefully cable in SHARK-NIR.
    1313•       Switch on the electronics cabinets.
     14•       Install the instrument workstation in the server room and scientific camera workstation in control room level 2
     15•       Install the scientific camera workstation in control room level 2
    1416•       Connect SHARK-NIR to the LBT network.
    1517**Success criteria**
     
    1820**Notes**
    1921**LBTO support**
    20 •       Support to connect to LBT network.
     22•       IT Support to connect to the LBT network.
    2123•       Any electronics support needed?
    2224**Associated SHARK-NIR personnel**