Changes between Version 1 and Version 2 of docs/CommissioningPlan/P1.4
- Timestamp:
- 10/06/20 12:00:55 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v1 v2 1 == P1.4 Cable in the instrument, power on, and connect to LBT network ==1 == P1.4 Cable in the instrument, power on, install workstations, and connect to LBT network == 2 2 • **Phase** : 1 3 3 • **Status** : Draft … … 6 6 • **Duration** : 2 hour(s) 7 7 **Description** 8 • At the LBT clean room, cable in the instrument. Power on the cabinets, and connect SHARK-NIR to LBT network.8 • At the LBT clean room, cable in the instrument. Power on the cabinets,install workstations, and connect SHARK-NIR to LBT network. 9 9 **Prerequisites** 10 10 • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network. … … 12 12 • Carefully cable in SHARK-NIR. 13 13 • Switch on the electronics cabinets. 14 • Install the instrument workstation in the server room and scientific camera workstation in control room level 2 15 • Install the scientific camera workstation in control room level 2 14 16 • Connect SHARK-NIR to the LBT network. 15 17 **Success criteria** … … 18 20 **Notes** 19 21 **LBTO support** 20 • Support to connect toLBT network.22 • IT Support to connect to the LBT network. 21 23 • Any electronics support needed? 22 24 **Associated SHARK-NIR personnel**