Changes between Version 7 and Version 8 of docs/CommissioningPlan/P1.3
- Timestamp:
- 01/25/21 13:15:31 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v7 v8 1 == P1.3 Install the instrumentin the cleanroom with its electronics cabinet ==1 == P1.3 Complete the installation of SHARK-NIR in the cleanroom with its electronics cabinet == 2 2 • **Phase** : 1 3 3 • **Status** : Draft … … 10 10 • All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom). 11 11 **Procedure** 12 • Carefully assemble and integrate the various opto-mechanical components. 13 • Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom). 12 • Carefully integrate the cryostat unit with the derotator-optical bench unit. 14 13 * Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocator for sanity checks. 15 14 • Install the electronics cabinet. … … 29 28 **Comments** 30 29 31 MB: when saying optomech components you mean cryostat to bearing for example? [Yes, for example] 30