    1 == P1.3 Install the instrument in the cleanroom with its electronics cabinet ==
     1== P1.3 Complete the installation of SHARK-NIR in the cleanroom with its electronics cabinet ==
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
     
    1010•       All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).
    1111**Procedure**
    12 •       Carefully assemble and integrate the various opto-mechanical components.
    13 •       Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom).
     12•       Carefully integrate the cryostat unit with the derotator-optical bench unit.
    1413* Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocator for sanity checks.
    1514•       Install the electronics cabinet.
     
    2928**Comments**
    3029
    31 MB: when saying optomech components you mean cryostat to bearing for example? [Yes, for example]