Version 7 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
P1.3 Install the instrument in the cleanroom with its electronics cabinet
- Phase : 1
- Status : Draft
- Category : Unpack, Assemble, Verification, and Installation (C1)
- Recurrence : once
- Duration : half a day
Description
- Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
Prerequisites
- All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).
Procedure
- Carefully assemble and integrate the various opto-mechanical components.
- Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom).
- Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocator for sanity checks.
- Install the electronics cabinet.
Success criteria
- The SHARK-NIR is primarily assembled on to the mechanical structure.
- Electronics cabinets are installed.
Notes
LBTO support
- Crane operator to lift and move stuff.
- 1-2 crew to support installation on the mechanical structure.
- Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.
Associated SHARK-NIR personnel
Date performed and by whom
Comments
MB: when saying optomech components you mean cryostat to bearing for example? [Yes, for example]
Attachments (7)
-
Shark-nir_ElectronicsRack_Padova.JPEG
(121.8 KB) -
added by kradhakrishnan 3 years ago.
Shark-nir_ElectronicsRack_Padova
-
Shark-Nir_CleanRoom_Space.jpg
(236.2 KB) -
added by kradhakrishnan 3 years ago.
Shark-Nir_CleanRoom_Padova_space
- Shark-Nir_CleanRoom_Space.2.jpg (235.8 KB) - added by kradhakrishnan 3 years ago.
-
SHARKNIR@LBTcleanroom.png
(235.2 KB) -
added by kradhakrishnan 3 years ago.
SHARKNIR@LBTcleanroom
- SHAR-NIR_remove_fan_over_DM_electronics.jpg (250.6 KB) - added by kradhakrishnan 3 years ago.
- SHARKNIR@LBTcleanroom_updated.png (221.3 KB) - added by kradhakrishnan 2 years ago.
- LBTO_rack.jpg (80.6 KB) - added by kradhakrishnan 2 years ago.
Download all attachments as: .zip