  • docs/CommissioningPlan/P1.3

    v6 v7  
    1212•       Carefully assemble and integrate the various opto-mechanical components.
    1313•       Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom).
     14* Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocator for sanity checks.
    1415•       Install the electronics cabinet.
    1516**Success criteria**
     
    2122•       Crane operator to lift and move stuff.
    2223•       1-2 crew to support installation on the mechanical structure.
     24* Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.
    2325**Associated SHARK-NIR personnel**
    2426