Changes between Version 28 and Version 29 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/25/22 17:28:56 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v28 v29 32 32 - 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 33 33 - Access to the LBTO electronics cabinet (Level 6) where the motor rack of SHARK-NIR will be installed. 34 - Optical bench - Newport model RS 4000 a nd is 4' x 6' in size already available in LBTO is fine.34 - Optical bench - Newport model RS 4000 already available in LBTO is fine. The minimum size of the optical bench we need is 900mm X 1800mm. Note that the optical bench may not be required at all. We request here, however, in case, for any reason, we need to open the cover of the SHARK-NIR bench and need some intervention. 35 35 - Access to the clean tent (of an area of 4.5m x 2.5m would be sufficient with the optical bench inside). 36 36 - Normal supplies for the clean tent (apparel, head covers, nytril gloves, shoe covers, etc.)