Changes between Version 28 and Version 29 of docs/CommissioningPlan/P1.3


Ignore:
Timestamp:
02/25/22 17:28:56 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.3

    v28 v29  
    3232- 1-2 crew to support installation procedure (mountain bay and/or cleanroom).
    3333- Access to the LBTO electronics cabinet (Level 6) where the motor rack of SHARK-NIR will be installed.
    34 - Optical bench - Newport model RS 4000 and is 4' x 6' in size already available in LBTO is fine.
     34- Optical bench - Newport model RS 4000 already available in LBTO is fine. The minimum size of the optical bench we need is 900mm X 1800mm. Note that the optical bench may not be required at all. We request here, however, in case, for any reason, we need to open the cover of the SHARK-NIR bench and need some intervention.
    3535- Access to the clean tent (of an area of 4.5m x 2.5m would be sufficient with the optical bench inside).
    3636- Normal supplies for the clean tent (apparel, head covers, nytril gloves, shoe covers, etc.)