Changes between Version 27 and Version 28 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/24/22 14:55:50 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v27 v28 31 31 - Forklift to move boxes. 32 32 - 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 33 - Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.33 - Access to the LBTO electronics cabinet (Level 6) where the motor rack of SHARK-NIR will be installed. 34 34 - Optical bench - Newport model RS 4000 and is 4' x 6' in size already available in LBTO is fine. 35 35 - Access to the clean tent (of an area of 4.5m x 2.5m would be sufficient with the optical bench inside).