docs/CommissioningPlan/P1.3
v15 v16 1 == P1.3 Complete the installation of SHARK-NIR in the cleanroom with its electronics cabinet==2 • **Phase**: 13 • **Status**: Draft4 • **Category**: Unpack, Assemble, and Verification (C1)5 • **Recurrence**: once6 • **Duration**: 1.5 day1 == P1.3 Installation of SHARK-NIR HW and electronics in clean room == 2 - **Phase** : 1 3 - **Status** : Draft 4 - **Category** : Unpack, Assemble, and Verification (C1) 5 - **Recurrence** : once 6 - **Duration** : 1.5 day 7 7 **Description** 8 •Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.8 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom. 9 9 **Prerequisites** 10 •All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).10 - All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom). 11 11 **Procedure** 12 • Carefully integrate the cryostat unit with the derotator-optical bench unit. 13 * Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks. 14 • Set up the electronics racks. 12 - Carefully integrate the cryostat unit with the derotator-optical bench unit. 13 - Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks. 14 - Set up the electronics racks. 15 **Templates** 16 15 17 **Success criteria** 16 •The SHARK-NIR is primarily assembled on to the mechanical structure.17 •Electronics racks are set up and ready to use.18 - The SHARK-NIR is primarily assembled on to the mechanical structure. 19 - Electronics racks are set up and ready to use. 18 20 **Notes** 19 21 20 22 **LBTO support** 21 • Crane operator to lift and move stuff (mountain bay and/or cleanroom). 22 • 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 23 * Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 24 * Optical bench and access to the clean tent. 25 **Associated SHARK-NIR personnel** 23 - Crane operator to lift and move stuff (mountain bay and/or cleanroom). 24 - 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 25 - Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 26 - Optical bench and access to the clean tent. 26 27 27 28 **Date performed and by whom** 28 29 29 **Comments**30