Changes between Version 11 and Version 12 of docs/CommissioningPlan/P1.3


Ignore:
Timestamp:
01/28/21 15:44:33 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.3

    v11 v12  
    1111**Procedure**
    1212•       Carefully integrate the cryostat unit with the derotator-optical bench unit.
    13 * Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocator for sanity checks.
     13* Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks.
    1414•       Install the electronics cabinet.
    1515**Success criteria**
     
    2222•       1-2 crew to support installation on the mechanical structure.
    2323* Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.
     24* Optical bench and access to clean tent.
    2425**Associated SHARK-NIR personnel**
    2526
     
    2829**Comments**
    2930
    30 LM: we have to discuss this internally, because some of the procedures are not clear to me. It is called iLocatEr, not iLocatOr. LBTO support should include providing an optical bench and the clean tent
     31LM: we have to discuss this internally, because some of the procedures are not clear to me. It is called iLocatEr, not iLocatOr. LBTO support should include providing an optical bench and the clean tent [DISCUSS]