     1== P1.3 Install the instrument in the cleanroom with its electronics cabinet ==
     2•       **Phase**               :       1 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Installation, integration, verification (C1)                           
     5•       **Recurrence**  :       once
     6•       **Duration**            :       4 hour(s)
     7**Description**
     8•       Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
     9**Prerequisites**
     10•       All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to cleanroom).
     11**Procedure**
     12•       Carefully assemble and integrate the various opto-mechanical components.
     13•       Install them one by one onto the mechanical structure (either at mountain bay or at the clean room).
     14•       Install the electronics cabinet.
     15**Success criteria**
     16•       The SHARK-NIR is primarily assembled on to the mechanical structure.
     17•       Electronics cabinets are installed.
     18**Notes**
     19**LBTO support**
     20•       Crane operator to lift and move stuff.
     21•       1-2 crew to support installation on the mechanical structure.
     22**Associated SHARK-NIR personnel**
     23•       JF, LM, MdP,
     24**Date performed and by whom**